Past programsPublic Sector · 2019–2022
Paper to fully virtual in under two weeks
When COVID closed every campus, I became the de facto product lead for a nine-campus college network, and built the PMO that ran it.
- Role
- Portfolio Manager, Global Operations
- When
- 2019–2022
- Scope
- 7 programs, 35–49 workstreams, 9 campuses, 7 international regions
- Domain
- Public sector
01 · Situation
Cégep de la Gaspésie et des Îles ran on paper and in-person services across nine campuses and international programs. When COVID shut everything down, tuition and continuity for 2,500+ enrolled students and about 1,000 incoming students were at risk. No product manager was assigned.
02 · The call
I spent the first days testing SaaS options that could plug into the existing systems, scoring them on cost, likely ROI and ease of use, and ran sessions with subject-matter experts across the campuses. Then I took a build-vs-buy recommendation straight to the executive team. The VP who owned the decision was risk-averse, so I laid out three paths side by side: do nothing, do a few things, or move on several fronts at once. Every scenario favored more action. He chose a phased middle path.
03 · What I did
- Moved paper and in-person processes onto Zoom, Omnivox, LÉA, digital documentation, websites and central dashboards in under two weeks.
- Showed where manual, human-run processes could be automated by a customized in-house system instead of bought off the shelf.
- Held one piece back on purpose. Automated document preparation needed more user onboarding than two weeks allowed, so I sequenced it into a later phase.
- Built the PMO behind the portfolio from nothing: standard planning, RAID and dependency tracking, central dashboards, documentation, executive reviews and shared ways of working. Then spent roughly two years scaling it and getting it adopted. The adoption took longer than the build.
- Mentored staff and adapted governance, technology and rollout plans to each campus's readiness.
04 · Results
- to a working digital operating model
- <2 wks
- in tuition revenue protected over three years ($2M a semester)
- $10M+
- enrolled students kept on track, plus about 1,000 incoming
- 2,500+
- less paper and admin load once the phased automation landed
- >50%
- programs and workstreams under one governance model
- 7 / 35–49
05 · What it shows
PRODUCT JUDGMENT UNDER PRESSURE · EXECUTIVE INFLUENCE · BUILD VS BUY · CHANGE ADOPTION · BUILDING A PMO FROM ZERO